Hana ʻia nā keʻena hoʻonaʻauao solar akamai i hana ʻia e Weeyu Electric ma Aba Prefecture, Sichuan Province

Ma ka lā 27 o Kepakemapa, ua hoʻokomo ʻia ka hale hoʻonaʻauao lā akamai mua ma Aba Prefecture ma ke awāwa ʻo Jiuzhai. Ua hoʻomaopopo ʻia e hahai ana kēia ma hope o ka wahi lawelawe ʻo Wenchuan Yanmenguan, ʻo Songpan kahiko ke kūlanakauhale mākaʻikaʻi kikowaena kikowaena ma hope o ka hana ʻana o ke kolu o ka hoʻouka ʻana ma ke alanui ʻeiwa.

Hoʻolālā ʻia a hoʻonohonoho ʻia nā puʻupuʻu o ka hale hoʻonaʻauao solar akamai e Weeyu Electric e like me ke kumu o ka "unified standard, unified specification, unified labeling, optimized distribution, safe and trustly, moderately advanced" of state Grid. Ua hoʻomaka ke kūkulu ʻia ʻana o ke keena hoʻonaʻauao ma ʻAukake 10, 2021 a ʻoi aku ma mua o hoʻokahi mahina e hoʻopau ai.

asfdfgn (2)

ʻO Hilton Jiuzhai Valley Charging Station ʻo "ka hale hoʻoili kiʻi kiʻi kiʻi kiʻi mua ma Aba Prefecture". Hoʻohana ia i ka hoʻolālā kila a me ka hoʻolālā ʻana i nā hiʻohiʻona, a loaʻa iā ia nā hiʻohiʻona o ka helu hoʻololi photoelectric kiʻekiʻe, haʻahaʻa haʻahaʻa, hana mechanical paʻa a me ka hana mana makahiki kiʻekiʻe. ʻO 37.17kW ka nui o ka mana i hoʻokomo ʻia, ʻo ka mana o ka makahiki ma kahi o 43,800 KWh, a hiki ke hoʻemi ʻia ke kalapona e 34164 tons. E hoʻomaopopo i ka noi "hoʻohui" o ka hana mana o ka lā a me ka hoʻouka ʻana.

asfdfgn (1)

He 4 mau puʻupuʻu hoʻoili DC a me 8 mau pū hoʻoili, hiki ke hoʻouka i 8 mau kaʻa uila hou i ka manawa like. Hoʻohana ka puʻu hoʻoili i ka ʻenehana hiki ke hoʻololi i ka mana. Ma ke ea kiʻekiʻe o Aba, hiki i kēia mau puʻupuʻu hoʻopiʻi ke piʻi i 120KW, e hoʻopaʻa ana i 2 degere o ka uila i kēlā me kēia minuke, a ʻo ka hoʻouka ʻana i nā degere 50 he 30 mau minuke wale nō, e hōʻike ana i ka pae ʻenehana oʻo o Weeyu Electric i kēia manawa.

Sep-30-2021